Gulley Remodeling & Home Improvment

"Dedicated to Excellence General Contractor" 859-225-5834

Home
Slide Shows
Currently Posted Projects
Completed Projects
Slide Show (Before and Af
About Us
Contact Us
Site Map
Frequently Asked Question
Project Blog's
Green Building
Customer Satisfaction
 
Currently Posted Projects 
 

 

 

"The Morrow Project"

 

This project consists of a "somewhat" historical bath remodel.  The bathroom originally consisted of a single lavatory, a tub, and a water closet.  The primary objective of this remodel was to update the bathroom as a whole and to increase the overall size of the bathroom.  The plan is to demolish and remove the existing rear wall of the bathroom.  This wall serves as both the rear wall of the bathroom as well as the rear wall of the attached storage shed.  Our intention is to remove the divider wall (as it is not load bearing) and extend the bathroom back 4 feet.  The original dimension of the bathroom is 5'-6" x 7'-9"  Upon completion the overall dimension will be 5'-6" x 11'-3"  That is a lot of room to gain when talking about a bathroom.  Some of the amenities of the new bath will be a new lavatory, a new water closet, and a new claw foot tub.  Our goal is to try and maintain the original integrity of the bathroom, keeping the overall style the same as possible.  Below you will find a slideshow of the demolition phase.  Check back soon to find pictures of the drywalling phase and the finished product !!

 

 

 

 


 
"The Milam Project"  Completed
     This project consisted of adding a 32' x 14' "shed roof" dormer.  The house was ready for an upgrade.  The main goal of the cutomer was to increase space.  And that we did.  We added over 400 square feet of living space to the existing home, not to mention another full bathroom with a tub/shower.  The job turned out wonderfully with no sudden suprises or problems.  Some of the features of this project included enegry efficient windows, "PEX" plumbing lines, maintenance free vinyl siding, "Mulehide" cold process rubber roofing, and much more.  There were also several aspects of the existing structure that had to be updated such as the main roof support beam, the roof's ridge beam, 95% of the rafters, and the rear soofit system, and a wall mounted "P-Tack" heat pump system for conditioning the air space.  The homeowner was totally satisfied and could not be happier.  Look for this reference in our previous client reference packet soon!
 
 
"Completed Exterior/Interior"
 
 
Completed Exterior/Interior
Pause Stop Previous Next View full-sized photos
 
"Before and After"
 
What a Change !
  
 
 
 
"
This is what the professionals at Gulley Remodeling can do for you !"
 
 
 
Carla Fitch 
 Replace drywall on basement celling & replace drywall on basement soffits then paint all the drywall
 
 
 
Brucato job 
This project  is about cover all overhang with vinyl and aluminum, Remove 80 linear feet of privacy fence , Remove 72 linear feet of chain of chain link fence and Install cedar fence
 
 
Pause Stop Previous Next View full-sized photos
 
 
 
 
 
Adam Fain
This job is  basement repairs, exterior repairs & first floor Repair too
The work start on 12/4/2008 and estimated to finish by two weeks
 
 
 
Pause Stop Previous Next View full-sized photos
 
Gulley Remodeling is doing extra job for Mr. Fain 
 
Lora Boller
 
 
Replace Aluminum Awning and do a Gutter job
 
 
 
 
 
Mrs. Monday's  Job
  Its paintting job for whole house. Job completed by 2/6/2009, and start another job for Mrs.  Monday.
 
 
PGR Appartments
 
 
 
 
 
Gulley Remodeling is the contractor for PGR properties, so the job for them will never finish, its countinuos job.
 
Milam's   Job
 we will start  another job for Ms. Milam ,she wants Gulley Remodeling to finish it. it will start at the mid of August (Roofing ). Gulley Finshed Dry wall and we are going to remodele the bathroom soon, will start in mid of April 2009.
 
Mrs. Thomas's Job 
Gulley Remodeling doing general remodeling for Mrs. Thomas.
 
 
 
Ice Storm
 

Our Teams at Gulley Remodeling are busy remodeling several customers’ houses after the ice storm.

 

 

 

Pat Basement

Gulley Remodeling are  doing whole basement finishing, tile, insulation, drywall, painting, kitchen capinets,  electrical & plumbing.

will finish by the end of April .

 

 Milam  Job

Bathroom Remodeling took like a week to finish it.5/5/2009

 

 

Tomah Job 

Drywall & painting will Start at the begining of May 2009

 

 Greg Kloosner

Build a Deck 12 x 9'   will start on April

 

 

  Katie Yu

 Small Remodele Job

 

 

Beach Job

 

Gutter Job will start soon

 

Parr Job

Start on 5/11/2009 Full Basement  Remodeling

 

 Dr, Wood  Job

 Will start at the end of May 2009 and its General Remodeling, this job has a lot of general remodeling and concrete sidding too, nearly will take few weeks, and will finish by the end of june to mid july

 

 Repair Affair

charity work  for  elder people through HBAL, and we are proud we do at least one job every year- took at least 2 weeks to do it

 

Concrete Patio- Cheek

 Will start on 5/21/2009 for new customer

 

 Roofing Job- Klein

 Will start soon

 

 Dikerson Refegirator

General Remodeling

 

 These are Jobs for May 2009

    

 

 

Gulley Remodeling will start a new job at June for PGR Properties at least will take a few weeks to finish  it the general remodeling-( Deck & Roofing+Siding)

 

 

Jobs Currently doing- June & July 2009 

    Dr Rebert Wood- General remodeling ( Sidding- roofing and others)

 

Plasma Center- general remodeling

 

 

Scott County School

Concrete job

 

 

AFB

 Borch

 

 

Pittman

General Remodeling + roofing

 

 

Johnson Control

General Contractor

 

Sos Fascilty

 General Contractor

 

Urban Partition

Two Jobs In Paris & Versailles

 

 

Jobs Done on July

 

Pause Stop Previous Next View full-sized photos

 

1- Dr Wood more Remodeling

2- Lynn Pedigo- General remodeling

3- Becky Sylevester- Deck

4- David Thornton- Greater Lexington Insurance- Deck

5- Charles Queen -Kitchen remodeling

6-Plasma Center

7-AFB - Borch

8-Scott County School- Steps

9-Pittman- Roof  Repair

10- Klein- Roof Repair

 

 

 

 

 

 

Jobs Done on August and September

 

 

1-Mrs Baesler-General Remodeling

2-Becky Sylevester- General Remodeling

3-Urban Partition- General Remodeling

4-AFB Bank- General Remodeling

5-Ben Tire-General Remodeling

6-Queen- General Remodeling

7-Mudd-Deck

8-Grimes-Roofing

9-Trail-BathRoom Remodeling

10-Sulivan-General Remodeling

11-Dexler-Sidding

12-Johnson Control-General Remodeling

13-Lyn Milam-General Remodeling

 

 

 

 

October 2009 

 

 

1- Miliam a countinous Remodeling tasks

2- Pruitt- Bathroom Remodeling

3-Plasma Center more work to do

4-Wayne Florernce- Deck

5-Barth Job- Roofing

6- Dr Wood Propery- General Remodeling

7-Brown Job - Instaling windows

8- Jill Job

9- Owens job

10-Rsi Job

11- Urban Partition Job

 

 

 

 November 2009
 
 
 
 
1- Dr Hume
2- Dr Wood Property- Exterior Remodeling
3- Gera Sulk
4- Mr Brown- Windows & Siding
5-Mariam Job- Basement
6- Plasma Center- General remodeling 
7-Horse Shoe
8-Mr White
9-Puitt
10-Miliam
11- Best Retail
12- Scott County school
13-Ashveiw  Farm
14- Florence
 
 
 
 
 December 2009
 
1- Dr Wood -  Interior Remodeling
2- Dr Hume- Masonary & concrete
3- HorseShoe Saloon- General Remodeling
4- Lynn Miliam Tile & Drywall
5-Girl scout- Office
6- Pruitt- Bathroom remodeling
7- Tayler- Kitchen Remodeling
8- Reba Sullivan- Roofing
 Grimes- Masonary & Roofing
9-Plasma Center- More work to do
 
 
 January 2010
1- Schooler will start soon
most of december 2009 still going & more change order for some- Extra work
 
Feb 2010
 Horseshoes Saloon - Days Inn
 Interior & Exterior
Plasma Center
Grimes
Girl scout
 Dr Hume - Broadway veterian clinic
   
 
 
March
 Horseshoes saloon - big job still going
 American legion
 Grimes-  deck & Painting it
Plasma blood center
 Mrs tayler- kitchen remodeling
 Mrs  Heistan
 
 
 
 Apri  2010
 Horseshoes' saloon
 Plasma center- Interior remodeling
American legion
Central State Manager
Grimes- Roofing
 
 
 
 May 2010
 Maysville Roofing
Horseshoes saloon
Mark Pittman
Flitcher
Kiecher
Miller
Boldman